
Below the rib is drilled to the spar with #40 drill and clecoed to rib. It will be final drilled to #30 before priming ribs.

Outer ribs are all drilled and clecoed.

Inner ribs are all drilled and clecoed.
Most of the inner ribs also have a 3/4 by 3/4 angle bracket that is riveted to the rib and then is bolted to the spar. You can see them in the picture below (they are the anodized angle).

No comments:
Post a Comment