The F-404G channels are installed with pop rivets as there is no way to get access to the inside to rivet them. I will leave them clecoed in place until after the aircraft wiring is installed. That way if I need to route some wiring through the F-404 bulkhead, it will be a lot easier to do.

No comments:
Post a Comment